Mohit ConstructionGeneral Contractor · Long Island

General contractor · Cedarhurst, Nassau County

Built right, block by block.

Mohit Construction is a licensed general contractor based in Cedarhurst, Nassau County: gut renovations, brownstone restoration, apartment remodels, additions and storefront fit-outs across Nassau County and Queens.

  • Licensed & insuredInsurance certificates issued to your building before we start.
  • Permits closedFiled with your architect, inspected and signed off.
  • Long Island & NYCBased in Cedarhurst, Nassau County; also serving Queens and Brooklyn.

A New York general contractor

We plan it, file it, build it and close it out.

Mohit Construction is a licensed general contracting company based in Cedarhurst, Nassau County. We plan the work, handle the paperwork with your architect, build to the drawings, and then close the permit.

  1. 1

    Written, itemized proposals

    Every line priced and every allowance named, so you can compare us line by line.

  2. 2

    Licensed, insured, documented

    Certificates of insurance naming your building, issued before day one.

  3. 3

    Paperwork done with your architect

    Filings, inspections and sign-offs. We don't leave open permits behind.

  4. 4

    Protected, tidy sites

    We protect common areas, respect the neighbors and keep to the work hours your building sets.

  5. 5

    One person accountable

    You always know who is running your job and what happens this week.

A row of brownstones with carved stone stoops and iron newel posts on a tree-lined street
Brownstone stoops on a tree-lined block, the kind of house we work on. Illustrative photo.

Licensing: NYC DOB General Contractor Lic. #614236. License and insurance documents are provided with every proposal.

What we build

Eight kinds of work, one accountable team.

Pick the work closest to yours. Each one shows what's usually involved, what New York asks for in paperwork, and how long it often takes.

A room stripped back to exposed brick and insulation, with a large window onto the city
A typical gut renovation: walls opened to brick and studs. Illustrative photo.

Gut renovations

We take a house or apartment back to brick and studs and rebuild it properly, with a new layout, new plumbing and wiring, insulation, and finishes built to last. The work is filed with the Department of Buildings and inspected along the way.

  • Demolition to brick & studs
  • New layout & framing
  • Plumbing & electrical rough-in
  • Insulation & drywall
  • Floors & millwork
  • Kitchens & baths
Who it's for
Townhouse owners, and buyers of apartments that need everything done.
Paperwork
Usually an Alteration filing in DOB NOW by your architect, plus board approval for apartments.
Often takes
4–8 months on site for an apartment, 9–18 months for a townhouse.
Ask about a gut renovation

Plumbing and electrical work is performed by NYC-licensed master plumbers and electricians and filed under their licenses. Structural work is designed by a licensed engineer. Photography is illustrative.

How it works

From the first walkthrough to the final sign-off.

In New York, the paperwork often takes as long as the building. We start the filings early and keep you told what happens next, every week.

Hands reviewing architectural plan sheets with a pencil and calculator
The drawings come first. Your architect's set drives both the permit and the price. Illustrative photo.
  1. Walkthrough & scope

    We visit, measure, look behind what we can and listen. You get a written scope and an itemized proposal.

    WhoYou and our project leadOften takes1–2 weeks
  2. Drawings

    Your architect or engineer draws the work. We price against their set, so the number matches what gets filed.

    WhoYour architect or engineer, with usOften takes1–3 months
  3. Approvals

    Filings in DOB NOW, plus Landmarks if you're in a historic district, and your co-op or condo board.

    WhoYour architect files, and we pull the work permitOften takesWeeks to several months
  4. Build

    Protection, demolition, structure, plumbing and electrical rough-in, and the inspections that go with them.

    WhoOur crews and NYC-licensed tradesOften takesSet by the scope
  5. Finish

    Walls, floors, tile, millwork, fixtures and paint, then a punch list we walk through together.

    WhoOur crews, with youOften takesThe last third of the build
  6. Sign-off & close-out

    Final inspections and sign-offs, then a Letter of Completion or Certificate of Occupancy where one applies.

    WhoDOB, your architect and usOften takesA few weeks after finishing

Why close-out matters: an open permit can hold up a sale or a refinance years later. Every job we run ends with its permits signed off.

Get a cost range

Cost range

Get a realistic number before anyone visits.

Answer four questions and see a planning range in US dollars, built from published New York City and national cost data. Prefer to talk it through? Describe your project instead.

  1. Work
  2. Building
  3. Size
  4. Finish

What are you planning?

Building in New York

Permits, Landmarks, boards and facades, explained.

These are the four things that shape most New York projects before a single wall comes down. Here's what each one means, in plain English.

Drawing sheet: a typical New York brownstone in front elevation and sectionOur own line drawing, not to scale. Left: the front elevation of a 25-foot-wide, four-story brownstone with a stoop up to the parlor floor and a bracketed cornice. Right: a section through the 45-foot-deep house showing the cellar, garden floor, a 12-foot parlor floor, and the third and fourth floors, with floor heights in feet.A · FRONT ELEVATIONB · SECTION9′12′10′9′25′-0″ WIDECELLARGARDENPARLOR3RD FLOOR4TH FLOORstoop level · tallest ceilings8′9′12′10′9′45′-0″ DEEPSIDEWALKMOHIT CONSTRUCTIONGENERAL CONTRACTORTYPICALBROWNSTONE25′ × 45′ · 4 ST + CELLARLOT 25′ × 100′ILLUSTRATIVE · NTSSTREET ← · → REAR YARD
A typical brownstone, front elevation and section. Our own drawing, not to scale.

Permits from the Department of Buildings

Most work that moves plumbing, opens walls, changes a layout or touches structure needs a permit. A registered architect or professional engineer files the plans in DOB NOW, and the contractor pulls the work permit.

  • New Building: a new structure.
  • Alteration-CO: changes use, occupancy or egress and needs a new or amended Certificate of Occupancy. Older paperwork calls this Alt‑1.
  • Alteration: most renovations, such as a gut with plumbing changes. This was formerly Alt‑2.
  • Close-out: inspections and sign-offs, then a Letter of Completion or C of O.

Sources: NYC DOB: DOB NOW Build · Letter of Completion

Why it mattersPainting or refinishing floors usually needs no permit. Anything bigger usually does, and an open permit can hold up a sale or refinance. We close ours.

Ten words you'll hear on a New York job

Stoop
The front steps up to a rowhouse's parlor floor.
Parlor floor
The floor the stoop leads to, with high ceilings and the best original detail.
Cellar vs basement
A basement is at least half above the curb; a cellar is mostly below it and generally can't be lived in.
Sign-off
DOB's approval that an inspected piece of work is complete.
Letter of Completion
Closes an alteration permit that doesn't change the C of O.
C of O
Certificate of Occupancy: the building's legal use and number of units.
COI
Certificate of insurance, often naming your building as additional insured.
Alteration agreement
Your co-op or condo's rules for renovating: approvals, hours and fees.
SWARMP
A facade rated "safe with a repair and maintenance program."
White box
A commercial space delivered with basic walls, lighting and services, ready to fit out.
Kitchen mid-renovation: cabinets wrapped in plastic, paper floor protection and a ladder A finished white kitchen with a dark island, pendant lights and stainless appliances
Illustrative: two different kitchens, showing a typical start and finish.

What the work looks like

Typical scopes, start to finish.

  • DuringFloors and common areas protected, dust controlled, and everything that stays wrapped. Inspections happen while walls are still open.
  • HandoverThe punch list walked together, the space cleaned, and warranties and manuals handed over.
  • Close-outSign-offs filed and the permit closed, so there are no surprises when you sell or refinance.

These photos are illustrative and show the kind of work we take on.

Lower Manhattan skyline and the Brooklyn Bridge over the East River on an overcast day

Where we work

Nassau County and New York City.

Hudson River Upper Bay Atlantic Ocean Bronx Manhattan Queens Brooklyn Staten Is.

Based in Cedarhurst, Nassau County, serving Nassau County and Queens. We also take on work in Brooklyn. The map shows the five boroughs; ask us about an address anywhere in between.

Questions

What New Yorkers ask before they renovate.

Have a question that isn't here? Ask us directly. A straight answer costs nothing.

Do I need a permit for my renovation?

Cosmetic work like painting or refinishing floors usually doesn't. Moving plumbing, adding a bathroom, opening walls or changing the layout usually does. Your architect or engineer files it with the Department of Buildings in DOB NOW, and we pull the work permit.

What's the difference between Alt‑1 and Alt‑2?

Those are the old names. In DOB NOW they're "Alteration-CO," for work that changes the Certificate of Occupancy (use, occupancy or egress), and "Alteration," which covers most renovations.

My building is in a historic district. What changes?

Exterior work, and some interior work that affects the exterior, needs a Landmarks Preservation Commission permit before DOB will issue one. Rear and rooftop additions typically go to a public hearing. We build to the approved materials and details.

How long does co-op board approval take?

Often several months. We prepare the contractor documents for your board package, including license, insurance certificates naming the building, and schedule, so the contractor side isn't what holds you up.

Does Local Law 11 apply to my brownstone?

Only buildings taller than six stories are in the Facade Inspection & Safety Program. Most brownstones aren't, but their stoops, cornices and stone still need maintenance. For larger buildings, we carry out the repairs your inspector's report calls for.

How accurate is the online cost range?

It's built from published New York City and national cost data, so it's a planning range, not a quote. Drawings, site conditions, finishes and building requirements set the real number. We give you that number in writing after a walkthrough.

Can I legalize my basement or add an ADU?

New city rules allow one accessory unit on many one- and two-family properties, plus a pilot for legalizing some existing basement and cellar apartments. Eligibility depends on your lot, ceiling height, egress and flood risk. An architect confirms it, and we can build it.

Are you licensed and insured?

Yes. We carry general liability and workers' compensation insurance and issue certificates of insurance to your building on request. Our license: NYC DOB General Contractor Lic. #614236.

Do you do commercial work?

Yes. We build storefronts, offices, small cafés and clinics, including coordinating the landlord's share of the work.

What happens after I send an inquiry?

We read it, then call or email to set up a walkthrough. After the visit, we send a written, itemized proposal.

Start a project

Start a project with us.

The more you tell us, the more useful our first call will be. Only your name, an email and the borough are required.

Add project details (optional: address, building, work, size, timing, approvals, budget)
What's the work? (choose any)
Co-op or condo board approval needed?
Landmarked or in a historic district?
Drawings or an architect?

Have drawings, photos or a facade report? Attach them to the email that opens when you send.

We use your details only to reply about your project.